The calendar moved by
Make too little and the shop can miss sales. Make too much and perishable sweets can go unsold. We asked whether forecasts could help align production with the changing calendar.
Diwali demand can arrive in a short seasonal rush. In our study, the festival date shifted by 19 days between years.
The calendar moved by
Make too little and the shop can miss sales. Make too much and perishable sweets can go unsold. We asked whether forecasts could help align production with the changing calendar.
The setting turns a technical forecasting problem into an operating decision people can picture.
Diwali moves across Gregorian dates. Repeating last year’s timing can put a forecast peak in the wrong weeks.
Mithai is perishable. Producing too early or too much can leave stock unsold.
Forecasts matter when they help a shop plan production under uncertainty, not just when an average score looks good.
We used a synthetic, calendar-grounded Ahmedabad shop simulation. It is a controlled stress test, not actual retailer data or a model of every Indian shop.
We looked beyond one average-error score to three connected questions.
Does the forecast express a festive demand peak, and how large is it?
Does the forecast follow Diwali when its date shifts, or repeat the old pattern?
Is the uncertainty dependable enough to inform production, and what happens to simulated business cost?
A model can show a clear peak and still time it poorly. Better forecast error also does not guarantee a better inventory decision.
A controlled evaluation of three forecasting models and practical alternatives on a synthetic mithai-shop scenario.
| Model | Evaluation version (pinned) |
|---|---|
| Yug-1 | Hub ec53758 · yug 0.1.1 |
| TimesFM 2.5 | Hub 1d952420 · timesfm 3.0.2 |
| Chronos-Bolt base | Hub 5d9f166d · chronos-forecasting 1.5.3 |
Protocol: zero-shot forecasts, 56-day horizon, up to 2,048 days of context, and float32. Foundation-model inference ran on a Kaggle Tesla T4; baselines and analysis ran locally.
The forecast-row total includes repeated robustness runs, not unique observations. Demand, shops, and financial outcomes are simulated.
Nine core forecasting strategies and four calendar-corrected variants faced the same simulated demand and planning conditions.
Yug-1, TimesFM 2.5, and Chronos-Bolt, each using sales history alone.
Seasonal naive and ETS, using historical patterns.
Standard regression and a version that accounts for demand hidden by sell-outs.
A fixed 10% production uplift and a calibrated version.
Known festival dates added to Yug-1, TimesFM, Chronos, and ETS forecasts.
History-only forecasts often leaned toward the old date. Adding calendar information moved peaks closer to the new one.
History-only peak timing
| Method | Clear peak | Median timing error | Old-date surge |
|---|---|---|---|
| Yug-1 | 48% | −17 days | +29% |
| TimesFM 2.5 | 33% | −16 days | +15% |
| Chronos-Bolt | 23% | −19 days | +17% |
| Seasonal naive | 100% | −20 days | +45% |
Negative timing error means early. Timing is reported only when a clear peak appeared.
WAPE reduction after calendar correction · percentage points
| Method | Base | R1 | R2 | R3 |
|---|---|---|---|---|
| Yug-1 | 10.3 | 5.6 | 9.4 | 4.7 |
| TimesFM 2.5 | 6.2 | 2.9 | 6.0 | 2.6 |
| Chronos-Bolt | 8.0 | 4.2 | 7.3 | 3.7 |
| ETS | 10.4 | 6.7 | 9.6 | 5.9 |
These are scenario-specific reductions, not final WAPE scores. All four tested families improved in the reported settings. Supplying the date helped more than switching among tested architectures in this simulation.
The lowest forecast error did not automatically produce the lowest-cost simulated decision.
| Forecast and planning method | Simulated regret |
|---|---|
| Censor-aware calendar regression | ₹47,602 |
| Calendar regression | ₹50,855 |
| TimesFM + calendar | ₹52,847 |
| Yug-1 + calendar | ₹52,882 |
| TimesFM, history only | ₹82,656 |
| Yug-1, history only | ₹87,051 |
Lower is better. Regret is simulated INR cost per product plan, not actual revenue, profit, or savings. The ₹35 difference between Yug-1 + calendar and TimesFM + calendar is inconclusive: paired 95% interval −₹1,914 to +₹1,603.
The result depends on the forecast and the planning policy together. This table reflects its stated study configuration; figures from separate comparisons should not be mixed into this ranking.
The clearest signal was about calendar context. No single model won every part of this test.
A clear peak appeared in 48% of cases. When present, it was a median 17 days early, with a 29% phantom surge near the old date.
Clear peaks appeared in 33% for TimesFM and 23% for Chronos. Seasonal naive always produced a peak, but it was 20 days early with a 45% old-date surge.
Calendar correction improved WAPE for Yug-1, TimesFM, Chronos, and ETS. In the base setting, ETS improved 10.4 points and Yug-1 10.3.
Censor-aware calendar regression had the lowest simulated regret in the reported comparison. Yug-1 + calendar and TimesFM + calendar were only ₹35 apart, with an inconclusive interval.
Repeated runs showed variation, and an independent check recomputed released metrics.
The original seed favored Yug-1 in 15 of 16 comparisons and was unusually favorable. That makes seed sensitivity important to report.
A separate source-level review suggested areas to measure. It did not test serving performance or establish an architectural problem.
The reviewed prediction path iterates over input series and samples trajectories beyond an output block. How do series count and horizon affect quality and end-to-end compute?
The reviewed implementation uses cached, blockwise decoding. What runtime differences appear at matched horizons and workloads?
Its reviewed implementation uses patch-based inputs and predicts configured-horizon quantiles. When do direct-horizon and extended-rollout approaches trade off quality and cost?
Measure a forecast-quality versus compute-cost frontier before deciding whether serving changes or model changes are useful.
Vary the number of related and independent series. Compare existing and vectorized paths with the same checkpoint and forecast settings.
Measure forecast quality, calibration, tails, and actual serving cost across sampling budgets, seeds, domains, and horizons.
Measure context and continuation costs, memory, numerical agreement, quality, and calibration before considering caching or reuse.
Existing Birla AI Labs measurements may narrow what needs testing. Weight adaptation is a later question only if the data and model interface support it.
The Mithai study offers a controlled view of forecast behavior and simulated decisions. A joint study could examine what changes when retail histories, calendars, regions, and operating constraints vary.
View the Yug-1 architecture review Standalone presentation · opens in a new window ↗Research design, careful baselines, scenario analysis, and evaluation that connects forecasts to decisions.
Agree on a consented data protocol, define the covariate experiment, and report where forecasts are accurate, calibrated, and useful.
Research that informs the next model, and the conditions under which it can support better planning.
We’d welcome a conversation about co-designing a deeper study on larger, varied sales data.